← Projects
Hickory Data Centre — Truganina
PRJ-2026-004 ·
Hickory Group ·
Data Centre · Truganina, VIC
In production
What this site is worth, by division
Summed from the accepted quote lines, the jobs and the coating docketsSteel Supply
$245,202
3 stock lines allocated
Manufacturing
$200,861
4 jobs · 270 est hours
Coating Services
$59,064
1 docket · 378 m²
Project total
$505,127
$872,740 invoiced · $582,120 paid
Specification
1km of 3.6m 358 security mesh, 500m custom base-plated and in-ground posts, HDG then powder coat to Monument. Doogood warranty coating system.
Quotes
| Quote | Title | Total incl GST | Issued | Status |
|---|---|---|---|---|
| Q-2026-0450 | Hickory Data Centre Truganina — perimeter package | $535,450.96 | 12 Feb 2026 | Accepted |
Workshop jobs
$200,861 sell · $79,550 GP (39.6%)| Job | Title | Stage | Qty | Value | Due |
|---|---|---|---|---|---|
| J-2026-1104 | Custom base-plated post — Hickory DC north boundaryPosts · Monument® | Despatched | 168 | $81,648 | 30 Jul 2026 |
| J-2026-1117 | Custom in-ground post — Hickory DC east and southPosts · Monument® | Coating | 180 | $74,160 | 21 Aug 2026 |
| J-2026-1130 | Double swing gate 4.8m — Hickory DC main entryGate · Monument® | Welding | 3 | $26,700 | 26 Aug 2026 |
| J-2026-1455 | Replacement post — Hickory DC, 6 damaged in transitPosts · Monument® | Scheduled | 6 | $18,353 | 24 Aug 2026 |
Coating
378 m² across 1 docket| Docket | Description | Treatment | Colour | m² | Status |
|---|---|---|---|---|---|
| CD-2026-0910 | Custom in-ground post — Hickory DC east and south — internal, from J-2026-1117 | Powder coat only | Monument® | 378.0 | In coating run |
Steel supply allocated
| Item code | Description | Qty | Rate | Line |
|---|---|---|---|---|
| 358-3600-ZAL | 358 Security Mesh Panel 3.6m — Zalcote | 334 panel | $522.00 | $174,348 |
| POST-100-42 | Fence Post 100NB x 4.2m — HDG | 348 ea | $179.80 | $62,570 |
| HW-CLIP-358 | 358 Panel Clip Kit — anti-tamper | 334 kit | $24.80 | $8,283 |
Details
- Customer
- Hickory Group
- Contact
- James Calderwood
- ABN
- 27 006 447 118
- Terms
- 45 EOM
- Owner
- Craig Sullivan
- Opened
- 1 Jul 2025
- Expected
- 20 Sep 2026 (In 35 days)
- Probability
- 100%
- Site
- Truganina, VIC
Move stage
Invoices
| INV-2026-3219 | $290,620 | Sent |
| INV-2026-3218 | $582,120 | Paid |
Deliveries
| DEL-2026-1841 168 x Custom base-plated post | 8 Aug 2026 | Delivered |
Edit project
New quote
Against Hickory Data Centre — Truganina