Open pipeline
$4.12M
▲ 8.4%
11 projects · $1.76M weighted
Steel supply committed
$657k
▼ 2.1%
9 item codes below reorder
Workshop WIP
$899k
▲ 12.6%
24 live jobs · 13 due inside 7 days
Coating in the yard
5,057 m²
▲ 5.2%
20 trade dockets · $94k
Workshop margin
39.7%
▲ 1.8%
$357k on $899k of live work
Owed to us
$1.74M
▼ 4.7%
$139k past terms
Invoiced, last 30 days
$3.34M
▲ 6.9%
ex GST, all three divisions
Where the work is right now
Live jobs by stageCoating runs — next out of the ovens
All runs → Surfmist® · Batch plant CR-2026-0303 · 17 Aug 2026 · 0 dockets 0/240 m² Curing Black Satin · Automated line CR-2026-0306 · 17 Aug 2026 · 1 dockets 38/180 m² In oven Ironstone® · Batch plant CR-2026-0309 · 17 Aug 2026 · 0 dockets 0/220 m² Loading Ultra Silver · Batch plant CR-2026-0312 · 18 Aug 2026 · 0 dockets 0/240 m² Planned Monument® · Automated line CR-2026-0315 · 18 Aug 2026 · 2 dockets 440/180 m² Planned Basalt® · Batch plant CR-2026-0318 · 19 Aug 2026 · 0 dockets 0/220 m² Planned
Open pipeline by sector
Pipeline board → Data Centre $2.38M
Rail $688k
Factory $302k
Critical Infrastructure $186k
Commercial $186k
School $175k
Healthcare $128k
Needs someone today
3 Item codes out of stock 358-3000-PC, DMX-VRF-3000 +1 2 Jobs past their due date J-2026-1416 — Trackside gate 3.6m — Noble Park crossover 2 Coating past promised date CD-2026-0834 — Hallam Engineering & Machining 9 Below reorder on free stock On hand less what is already committed 5 Invoices past terms $139,480.00 outstanding 2 MYOB sync needs attention Credit hold and an unmapped stock item 7 Quotes out with customers $3.64M incl GST 2 Containers on the water Next ETA 11 Aug 2026 · Hebei Jinshi Industrial Metal
Activity
All → Q-2026-0520 opened by the customer AirTrunk MEL2 Derrimut — HVM perimeter package. Second open in two days. 17 Aug, 9:02am
MYOB Acumatica sync failed Invoice rejected — customer on credit hold in MYOB. Retry 2 of 5 scheduled 16:00. 17 Aug, 8:34am
358-3000-PC is out of stock 0 on hand against a reorder level of 22. On PO-2026-2996 with Hebei Jinshi, ETA 18 Oct. 17 Aug, 8:15am
CD-2026-0894 booked in Perforated feature panels — hotel facade. 186.4 m², chromate and coat, Ultra Silver. 17 Aug, 7:51am · Luke Antoniou
J-2026-1247 moved to QA Sliding gate 7.2m — NEXTDC M3 loading dock. DFT and colour match pending. 17 Aug, 7:08am · Adem Yilmaz
Coating run CR-2026-0306 loaded Interpon Black Satin — 168 m² of 180 m² capacity on the automated line. 17 Aug, 6:42am · Ricky Pereira
J-2026-1156 despatched Custom base-plated post — Hickory DC north boundary. 168 off, POD signed. 16 Aug, 3:40pm · Steve Ranger
CR-2026-0303 into cure Surfmist satin, 212 m². 12 minutes at 200°C. 16 Aug, 2:12pm · Ricky Pereira
PRJ-2026-018 moved to Tender submitted AirTrunk MEL2 Derrimut Expansion — $1.64M, ISO 22343-1 certified DooMAX. 16 Aug, 11:26am · Craig Sullivan