Dashboard Doveton · 16 Aug 2026
MYOB Acumatica · connected 16 Aug 2026

Where the work is right now

Live jobs by stage

Coating runs — next out of the ovens

All runs →

Open pipeline by sector

Pipeline board →
Data Centre $2.38M
Rail $688k
Factory $302k
Critical Infrastructure $186k
Commercial $186k
School $175k
Healthcare $128k

Needs someone today

Activity

All →
Q-2026-0520 opened by the customer AirTrunk MEL2 Derrimut — HVM perimeter package. Second open in two days. 17 Aug, 9:02am
MYOB Acumatica sync failed Invoice rejected — customer on credit hold in MYOB. Retry 2 of 5 scheduled 16:00. 17 Aug, 8:34am
358-3000-PC is out of stock 0 on hand against a reorder level of 22. On PO-2026-2996 with Hebei Jinshi, ETA 18 Oct. 17 Aug, 8:15am
CD-2026-0894 booked in Perforated feature panels — hotel facade. 186.4 m², chromate and coat, Ultra Silver. 17 Aug, 7:51am · Luke Antoniou
J-2026-1247 moved to QA Sliding gate 7.2m — NEXTDC M3 loading dock. DFT and colour match pending. 17 Aug, 7:08am · Adem Yilmaz
Coating run CR-2026-0306 loaded Interpon Black Satin — 168 m² of 180 m² capacity on the automated line. 17 Aug, 6:42am · Ricky Pereira
J-2026-1156 despatched Custom base-plated post — Hickory DC north boundary. 168 off, POD signed. 16 Aug, 3:40pm · Steve Ranger
CR-2026-0303 into cure Surfmist satin, 212 m². 12 minutes at 200°C. 16 Aug, 2:12pm · Ricky Pereira
PRJ-2026-018 moved to Tender submitted AirTrunk MEL2 Derrimut Expansion — $1.64M, ISO 22343-1 certified DooMAX. 16 Aug, 11:26am · Craig Sullivan