← Coating Intake
Custom in-ground post — Hickory DC east and south — internal, from J-2026-1117
In coating run
Surface area378.0 m²180 ea · 6,804 kg
TreatmentPowder coat onlyAS1627.4 Class 2.5 · AS4506-2005
Colour Monument® Dulux Duratec · Satin
Cost centre Job charged to J-2026-1117
DOOGOOD AUSTRALIA
Coating Services · Unit 5A, 28–30 Green Street, Doveton VIC 3177
1300 123 342 · ABN 58 126 447 903
1300 123 342 · ABN 58 126 447 903
Steel supplied by
Hickory Group
James Calderwood
ABN 27 006 447 118
ABN 27 006 447 118
Specification
Powder coat only
Dulux Duratec — Monument®, Satin
Blast to AS1627.4 Class 2.5 · Coat to AS4506-2005
Blast to AS1627.4 Class 2.5 · Coat to AS4506-2005
Received
| Description | Type | Pieces | Surface m² | Weight kg | Longest |
|---|---|---|---|---|---|
| Custom in-ground post — Hickory DC east and south — internal, from J-2026-1117 | Posts | 180 | 378.0 | 6,804 | 6.0 m |
Progress through the plant
Booked in Done
Received Done
Blasting Done
Ready to coat Done
In coating run Now
Curing —
QA —
Ready for despatch —
Despatched —
Details
- Customer
- Hickory Group
- Project
- PRJ-2026-004
- From job
- J-2026-1117
- Received
- 15 Aug 2026
- Promised
- 21 Aug 2026
- Treatment
- Powder coat only
- Colour
- Monument®
- Powder
- Dulux Duratec
- Gloss
- Satin
- Surface
- 378.0 m²
- Linear
- 907 m
- Weight
- 6,804 kg
- Longest piece
- 6.0 m
- Booked in by
- Luke Antoniou
In a run
CR-2026-0315 — Monument® Automated line · 18 Aug 2026 · 440 of 180 m² PlannedMove status
Edit docket