← Truganina Logistics Estate — Stage 2
Line marking bollard 165 CHS — Truganina
Critical Despatched
Sell value$7,504ex GST
Cost to make$5,639material, labour and coating
Gross profit$1,86524.9% margin
Hours21.0of 22 estimated
Operation card
8 of 8 complete Cut Bandsaw & Cutting 195 min 12 Jul, 10:00am
Owen Fitzgerald
Owen Fitzgerald
Bend Press & Folding 164 min 14 Jul, 10:00am
Owen Fitzgerald
Owen Fitzgerald
Fabricate Fabrication Bay 1 171 min 16 Jul, 9:00am
Owen Fitzgerald
Owen Fitzgerald
Weld Welding Bay 174 min 18 Jul, 11:00am
Owen Fitzgerald
Owen Fitzgerald
Blast Blast Booth 202 min 20 Jul, 2:00pm
Owen Fitzgerald
Owen Fitzgerald
Coat Powder Coating — Batch Plant 209 min 22 Jul, 12:00pm
Owen Fitzgerald
Owen Fitzgerald
QA QA & Packing 146 min 24 Jul, 12:00pm
Owen Fitzgerald
Owen Fitzgerald
Pack QA & Packing 193 min 26 Jul, 12:00pm
Owen Fitzgerald
Owen Fitzgerald
Materials
$3,667 at cost| Item code | Description | Required | Issued | In stock |
|---|---|---|---|---|
| BOL-CHS-165 | Bollard CHS 165 x 1200mm — HDG | 28 ea | 28 | 49 |
| HW-BOLT-M12 | Cup Head Bolt M12 x 40 — HDG | 58 ea | 58 | 67 |
Hours logged
7.6 hours| Owen Fitzgerald | 13 Aug 2026 | Direct | 7.6 h | Approved |
Details
- Customer
- ADCO Constructions
- Project
- Truganina Logistics Estate — Stage 2
- From quote
- Q-2026-0527
- Type
- Bollard
- Quantity
- 28 ea
- Work centre
- Fabrication Bay 2
- Assigned
- Owen Fitzgerald
- Opened
- 9 Jul 2026
- Due
- 6 Aug 2026
- Finished
- 5 Aug 2026
- Colour
- Basalt®
- Powder
- Dulux · Satin
- Drawing
- DG-4481-B1
Move stage
Moving to Blast or Coating books this job into the coating queue with its m² and colour already on it.
Specification
Chain mesh 2.4m with barbed top, 3 sliding gates, wheel stops and line marking bollards.
Edit job
Log hours against this job