DDoogood
DDoogood Australia
Q-2026-0527 Truganina Logistics Estate Stage 2
MYOB · connected 16 Aug 2026
← Truganina Logistics Estate — Stage 2

Truganina Logistics Estate Stage 2

Q-2026-0527 · ADCO Constructions · Issued 28 Mar 2026 · Valid to 27 Apr 2026
Accepted

Lines

Cost $129,172 · GP $78,157 (37.7%)
DivisionItemDescriptionQtyRateCostAmount
Steel Supply CHM-50-25-2400 Chain Mesh 2400mm — 50mm x 2.5mm 268 roll $397.00 $248.00 $106,396.00
Steel Supply WIRE-BARB-500 Barbed Wire 500m Coil — HDG 42 coil $189.00 $118.00 $7,938.00
Steel Supply POST-6560-30 Fence Post 65NB x 3.0m — HDG 486 ea $68.50 $42.60 $33,291.00
Manufacturing Sliding gate 6.0m on tunnel posts 3 ea $17,400.00 $10,800.00 $52,200.00
Manufacturing Line marking bollard 165 CHS — surface mount 28 ea $268.00 $166.00 $7,504.00