← Projects
Truganina Logistics Estate — Stage 2
PRJ-2026-016 ·
ADCO Constructions ·
Factory · Truganina, VIC
In production
What this site is worth, by division
Summed from the accepted quote lines, the jobs and the coating docketsSteel Supply
$147,625
3 stock lines allocated
Manufacturing
$59,704
2 jobs · 94 est hours
Project total
$207,329
$249,920 invoiced · $203,060 paid
Specification
Chain mesh 2.4m with barbed top, 3 sliding gates, wheel stops and line marking bollards.
Quotes
| Quote | Title | Total incl GST | Issued | Status |
|---|---|---|---|---|
| Q-2026-0527 | Truganina Logistics Estate Stage 2 | $228,061.90 | 28 Mar 2026 | Accepted |
Workshop jobs
$59,704 sell · $21,427 GP (35.9%)| Job | Title | Stage | Qty | Value | Due |
|---|---|---|---|---|---|
| J-2026-1351 | Sliding gate 6.0m — Truganina Logistics Stage 2Gate · Basalt® | Despatched | 3 | $52,200 | 8 Aug 2026 |
| J-2026-1364 | Line marking bollard 165 CHS — TruganinaBollard · Basalt® | Despatched | 28 | $7,504 | 6 Aug 2026 |
Steel supply allocated
| Item code | Description | Qty | Rate | Line |
|---|---|---|---|---|
| CHM-50-25-2400 | Chain Mesh 2400mm — 50mm x 2.5mm | 268 roll | $397.00 | $106,396 |
| WIRE-BARB-500 | Barbed Wire 500m Coil — HDG | 42 coil | $189.00 | $7,938 |
| POST-6560-30 | Fence Post 65NB x 3.0m — HDG | 486 ea | $68.50 | $33,291 |
Details
- Customer
- ADCO Constructions
- Contact
- Grant Ellery
- ABN
- 88 003 605 217
- Terms
- 45 EOM
- Owner
- Rachel Hoang
- Opened
- 15 Jan 2026
- Expected
- 10 Sep 2026 (In 25 days)
- Probability
- 100%
- Site
- Truganina, VIC
Move stage
Invoices
| INV-2026-3232 | $203,060 | Paid |
| INV-2026-3238 | $46,860 | Overdue |
Deliveries
| DEL-2026-1897 3 x Sliding gate 6.0m | 12 Aug 2026 | Delivered |
| DEL-2026-1904 28 x Line marking bollard 165 CHS | 11 Aug 2026 | Delivered |
Edit project
New quote
Against Truganina Logistics Estate — Stage 2