DDoogood
DDoogood Australia
CR-2026-0315 Monument® · Automated line · 18 Aug 2026
MYOB · connected 16 Aug 2026
← Coating Runs

Monument®

CR-2026-0315 · Automated line · Line oven · Satin · Dulux Duratec · Ricky Pereira
Planned
Loaded440 m² of 180 m² capacity
Dockets in this run2oven full
Trade value$0excludes our own jobs
Cure12 minat 200°C

What is in this run

440 m² across 2 dockets
DocketCustomerDescriptionTreatmentStatus
CD-2026-0910 ours Hickory Group Custom in-ground post — Hickory DC east and south — internal, from J-2026-1117 Powder coat only 378.0 In coating run
CD-2026-0916 ours City of Greater Dandenong Removable bollard 100 SHS — Dandenong civic — internal, from J-2026-1260 Powder coat only 61.6 In coating run

Waiting in Monument®

DocketCustomerFits?
CD-2026-0897
Stair stringers and landings
Dandenong Engineering Works 128.6 Next run

Run detail

Date
18 Aug 2026
Line
Automated line
Oven
Line oven
Colour
Monument®
Powder
Dulux Duratec
Gloss
Satin
Operator
Ricky Pereira
Capacity
180 m²