← Coating Runs
Monument®
CR-2026-0315 · Automated line · Line oven · Satin ·
Dulux Duratec · Ricky Pereira
Planned
Loaded440 m² of 180 m² capacity
Dockets in this run2oven full
Trade value$0excludes our own jobs
Cure12 minat 200°C
What is in this run
440 m² across 2 dockets| Docket | Customer | Description | Treatment | m² | Status |
|---|---|---|---|---|---|
| CD-2026-0910 ours | Hickory Group | Custom in-ground post — Hickory DC east and south — internal, from J-2026-1117 | Powder coat only | 378.0 | In coating run |
| CD-2026-0916 ours | City of Greater Dandenong | Removable bollard 100 SHS — Dandenong civic — internal, from J-2026-1260 | Powder coat only | 61.6 | In coating run |
Waiting in Monument®
| Docket | Customer | m² | Fits? |
|---|---|---|---|
| CD-2026-0897 Stair stringers and landings | Dandenong Engineering Works | 128.6 | Next run |
Run detail
- Date
- 18 Aug 2026
- Line
- Automated line
- Oven
- Line oven
- Colour
- Monument®
- Powder
- Dulux Duratec
- Gloss
- Satin
- Operator
- Ricky Pereira
- Capacity
- 180 m²