NEXTDC M3 — Port Melbourne Stage 2

PRJ-2026-011 · NEXTDC Limited · Data Centre · Port Melbourne, VIC
Won

What this site is worth, by division

Summed from the accepted quote lines, the jobs and the coating dockets
Steel Supply
$385,020
3 stock lines allocated
Manufacturing
$62,393
2 jobs · 100 est hours
Coating Services
$44,528
0 dockets · 0 m²
Project total
$491,941
$453,860 invoiced · $453,860 paid

Specification

3.0m 358 mesh perimeter with DooMAX VRF to the substation compound. Anti-climb, concealed fixings, Night Sky.

Quotes

QuoteTitleTotal incl GSTIssuedStatus
Q-2026-0457 NEXTDC M3 Port Melbourne Stage 2 — perimeter $516,062.36 28 Mar 2026 Accepted

Workshop jobs

$62,393 sell · $23,667 GP (37.9%)
JobTitleStageQtyValueDue
J-2026-1143
Sliding gate 7.2m — NEXTDC M3 loading dockGate · Night Sky®
QA 2 $39,600 19 Aug 2026
J-2026-1481
Bollard 165 CHS — NEXTDC substation, variation orderBollard · Night Sky®
Scheduled 18 $22,793 5 Sep 2026

Steel supply allocated

Item codeDescriptionQtyRateLine
358-3000-PC 358 Security Mesh Panel 3.0m — Powder Coated 288 panel $555.00 $159,840
DMX-VRF-2400 DooMAX VRF Crash Rated Palisade 2.4m — substation compound 96 bay $1,780.00 $170,880
POST-100-42 Fence Post 100NB x 4.2m — HDG 302 ea $179.80 $54,300

Details

Customer
NEXTDC Limited
Contact
Damien Fowler
ABN
35 143 582 521
Terms
45 EOM
Owner
Craig Sullivan
Opened
23 Oct 2025
Expected
17 Oct 2026 (In 62 days)
Probability
100%
Site
Port Melbourne, VIC

Move stage

Invoices

INV-2026-3225 $43,560 Draft
INV-2026-3224 $453,860 Paid

Deliveries

DEL-2026-1848
2 x Sliding gate 7.2m