← NEXTDC M3 — Port Melbourne Stage 2
Bollard 165 CHS — NEXTDC substation, variation order
Scheduled
Sell value$22,793ex GST
Cost to make$12,080material, labour and coating
Gross profit$10,71347.0% margin
Hours0.0of 26 estimated
Operation card
0 of 8 complete Cut Bandsaw & Cutting 195 min est Waiting
Bend Press & Folding 195 min est Waiting
Fabricate Fabrication Bay 1 195 min est Waiting
Weld Welding Bay 195 min est Waiting
Blast Blast Booth 195 min est Waiting
Coat Powder Coating — Batch Plant 195 min est Waiting
QA QA & Packing 195 min est Waiting
Pack QA & Packing 195 min est Waiting
Materials
$5,053 at cost| Item code | Description | Required | Issued | In stock |
|---|---|---|---|---|
| BOL-CHS-165 | Bollard CHS 165 x 1200mm — HDG | 39 ea | 0 | 49 |
| HW-BOLT-M12 | Cup Head Bolt M12 x 40 — HDG | 37 ea | 0 | 67 |
Details
- Customer
- NEXTDC Limited
- Project
- NEXTDC M3 — Port Melbourne Stage 2
- From quote
- Q-2026-0457
- Type
- Bollard
- Quantity
- 18 ea
- Work centre
- Fabrication Bay 2
- Assigned
- Tony Milenkovic
- Opened
- 21 Aug 2026
- Due
- 5 Sep 2026
- Colour
- Night Sky®
- Powder
- Dulux · Gloss
- Drawing
- DG-4488-B1
Move stage
Moving to Blast or Coating books this job into the coating queue with its m² and colour already on it.
Specification
3.0m 358 mesh perimeter with DooMAX VRF to the substation compound. Anti-climb, concealed fixings, Night Sky.
Edit job
Log hours against this job