← Casey Fields — Sports Precinct Stage 4
Ball-stop extension frame 6.0m — Casey Fields
Blast
Sell value$30,912ex GST
Cost to make$20,912material, labour and coating
Gross profit$10,00032.4% margin
Hours62.0of 74 estimated
Operation card
5 of 8 complete Cut Bandsaw & Cutting 552 min 7 Aug, 3:00pm
Owen Fitzgerald
Owen Fitzgerald
Bend Press & Folding 675 min 9 Aug, 1:00pm
Owen Fitzgerald
Owen Fitzgerald
Fabricate Fabrication Bay 1 672 min 11 Aug, 3:00pm
Owen Fitzgerald
Owen Fitzgerald
Weld Welding Bay 569 min 13 Aug, 12:00pm
Owen Fitzgerald
Owen Fitzgerald
Blast Blast Booth 486 min 15 Aug, 9:00am
Owen Fitzgerald
Owen Fitzgerald
Coat Powder Coating — Batch Plant 555 min est Running
QA QA & Packing 555 min est Waiting
Pack QA & Packing 555 min est Waiting
Materials
$12,197 at cost| Item code | Description | Required | Issued | In stock |
|---|---|---|---|---|
| HDG-50-36-M | 50 NB x 3.6mm HDG Pipe — Grade M | 124 length | 124 | 40 |
| HW-BOLT-M12 | Cup Head Bolt M12 x 40 — HDG | 278 ea | 278 | 67 |
| FIT-GUD-16 | Gudgeon Hinge 16mm — HDG | 293 ea | 293 | 105 |
Details
- Customer
- City of Casey
- Project
- Casey Fields — Sports Precinct Stage 4
- From quote
- Q-2026-0506
- Type
- Custom fence
- Quantity
- 138 ea
- Work centre
- Blast Booth
- Assigned
- Owen Fitzgerald
- Opened
- 4 Aug 2026
- Due
- 23 Aug 2026
- Colour
- Cottage Green®
- Powder
- Dulux · Satin
- Drawing
- DG-4508-F1
Move stage
Moving to Blast or Coating books this job into the coating queue with its m² and colour already on it.
In the booth
| CD-2026-0919 Blast + powder coat | 938.4 m² | Blasting |
Specification
Ball-stop fencing 6.0m on 100NB posts, Woolamai mesh to the pavilion, 4 pedestrian gates.
Edit job
Log hours against this job