← Coating Intake
Ball-stop extension frame 6.0m — Casey Fields — internal, from J-2026-1299
Blasting
Surface area938.4 m²138 ea · 16,891 kg
TreatmentBlast + powder coatAS1627.4 Class 2.5 · AS4506-2005
Colour Cottage Green® Dulux Duratec · Satin
Cost centre Job charged to J-2026-1299
DOOGOOD AUSTRALIA
Coating Services · Unit 5A, 28–30 Green Street, Doveton VIC 3177
1300 123 342 · ABN 58 126 447 903
1300 123 342 · ABN 58 126 447 903
Steel supplied by
City of Casey
Nadine Copeland
ABN 43 320 295 742
ABN 43 320 295 742
Specification
Blast + powder coat
Dulux Duratec — Cottage Green®, Satin
Blast to AS1627.4 Class 2.5 · Coat to AS4506-2005
Blast to AS1627.4 Class 2.5 · Coat to AS4506-2005
Received
| Description | Type | Pieces | Surface m² | Weight kg | Longest |
|---|---|---|---|---|---|
| Ball-stop extension frame 6.0m — Casey Fields — internal, from J-2026-1299 | Gates | 138 | 938.4 | 16,891 | 6.0 m |
Progress through the plant
Booked in Done
Received Done
Blasting Now
Ready to coat —
In coating run —
Curing —
QA —
Ready for despatch —
Despatched —
Details
- Customer
- City of Casey
- Project
- PRJ-2026-019
- From job
- J-2026-1299
- Received
- 15 Aug 2026
- Promised
- 23 Aug 2026
- Treatment
- Blast + powder coat
- Colour
- Cottage Green®
- Powder
- Dulux Duratec
- Gloss
- Satin
- Surface
- 938.4 m²
- Linear
- 2,252 m
- Weight
- 16,891 kg
- Longest piece
- 6.0 m
- Booked in by
- Luke Antoniou
Move status
Edit docket