DDoogood
DDoogood Australia
J-2026-1182 Gate track and counterbalance assembly — Ravenhall
MYOB · connected 16 Aug 2026
← Ravenhall Correctional — Sallyport Gates

Gate track and counterbalance assembly — Ravenhall

J-2026-1182 · Access · 4 ea · Department of Justice — Corrections Victoria · DG-4602-T1
Cut & prep
Sell value$34,400ex GST
Cost to make$18,032material, labour and coating
Gross profit$16,36847.6% margin
Hours12.0of 64 estimated

Operation card

1 of 8 complete
Cut Bandsaw & Cutting 470 min 14 Aug, 3:00pm
Owen Fitzgerald
Bend Press & Folding 480 min est Running
Fabricate Fabrication Bay 1 480 min est Waiting
Weld Welding Bay 480 min est Waiting
Blast Blast Booth 480 min est Waiting
Coat Powder Coating — Batch Plant 480 min est Waiting
QA QA & Packing 480 min est Waiting
Pack QA & Packing 480 min est Waiting

Materials

$723 at cost
Item codeDescriptionRequiredIssuedIn stock
HDG-50-36-M 50 NB x 3.6mm HDG Pipe — Grade M 8 length 8 40
HW-BOLT-M12 Cup Head Bolt M12 x 40 — HDG 3 ea 3 67
FIT-GUD-16 Gudgeon Hinge 16mm — HDG 8 ea 8 105

Details

Customer
Department of Justice — Corrections Victoria
Project
Ravenhall Correctional — Sallyport Gates
From quote
Q-2026-0485
Type
Access
Quantity
4 ea
Work centre
Bandsaw & Cutting
Assigned
Owen Fitzgerald
Opened
11 Aug 2026
Due
12 Sep 2026
Colour
Ironstone®
Powder
Dulux · Satin
Drawing
DG-4602-T1

Move stage

Moving to Blast or Coating books this job into the coating queue with its m² and colour already on it.

Specification

4 x cantilever sallyport gates, 8.4m clear opening, palisade infill to match existing. Interlock ready.