← Ravenhall Correctional — Sallyport Gates
Ravenhall Correctional — sallyport gates
Q-2026-0485 ·
Department of Justice — Corrections Victoria ·
Issued 25 May 2026 · Valid to 24 Jun 2026
Accepted
DOOGOOD AUSTRALIA
20 Green Street, Doveton VIC 3177
1300 123 342 · sales@doogoodaustralia.com.au
ABN 58 126 447 903
1300 123 342 · sales@doogoodaustralia.com.au
ABN 58 126 447 903
Quotation to
Department of Justice — Corrections Victoria
Ross McKendrick
Melbourne VIC
ABN 12 004 448 227
Melbourne VIC
ABN 12 004 448 227
Project
Ravenhall Correctional — Sallyport Gates
Prison
4 x cantilever sallyport gates, 8.4m clear opening, palisade infill to match existing. Interlock ready.
4 x cantilever sallyport gates, 8.4m clear opening, palisade infill to match existing. Interlock ready.
Manufacturing
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| — | Cantilever sallyport gate 8.4m clear — palisade infill, interlock ready | 4 | ea | $68,400.00 | $273,600.00 |
| — | Gate track and counterbalance assembly | 4 | ea | $8,600.00 | $34,400.00 |
Coating Services
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| — | Blast and powder coat — Ironstone satin, detention spec | 468 | m2 | $48.00 | $22,464.00 |
Notes
Prices are ex works Doveton unless stated. Products are manufactured to Australian Standards — AS/NZS 1163 and AS1074 for steel sections, AS/NZS 4534 for wire products, AS4506 for powder coating and AS1627.4 Class 2.5 for abrasive blasting. Powder coating carries a 15 year warranty on architectural finishes. Lead times confirmed on order.
| Subtotal (ex GST) | $330,464.00 |
| GST 10% | $33,046.40 |
| Total incl GST | $363,510.40 |
Lines
Cost $204,704 · GP $125,760 (38.1%)
| Division | Item | Description | Qty | Rate | Cost | Amount | |
|---|---|---|---|---|---|---|---|
| Manufacturing | — | Cantilever sallyport gate 8.4m clear — palisade infill, interlock ready | 4 ea | $68,400.00 | $42,600.00 | $273,600.00 | |
| Manufacturing | — | Gate track and counterbalance assembly | 4 ea | $8,600.00 | $5,300.00 | $34,400.00 | |
| Coating Services | — | Blast and powder coat — Ironstone satin, detention spec | 468 m2 | $48.00 | $28.00 | $22,464.00 |
Accept this quote?
It will allocate stock, raise the workshop jobs, book the coating and draft the deposit invoice — in one transaction.
Manufacturing — $308,000
Coating Services — $22,464
Deposit invoice $109,053 queued for MYOB
Ravenhall Correctional — Sallyport Gates moves to Won
Add a line