DDoogood
DDoogood Australia
J-2026-1169 Cantilever sallyport gate 8.4m — Ravenhall
MYOB · connected 16 Aug 2026
← Ravenhall Correctional — Sallyport Gates

Cantilever sallyport gate 8.4m — Ravenhall

J-2026-1169 · Gate · 4 ea · Department of Justice — Corrections Victoria · DG-4602-G1
Fabrication
Sell value$273,600ex GST
Cost to make$146,600material, labour and coating
Gross profit$127,00046.4% margin
Hours118.0of 248 estimated

Operation card

3 of 8 complete
Cut Bandsaw & Cutting 1,527 min 14 Aug, 10:00am
Ben Rowe
Bend Press & Folding 1,856 min 16 Aug, 12:00pm
Ben Rowe
Fabricate Fabrication Bay 1 1,954 min 18 Aug, 12:00pm
Ben Rowe
Weld Welding Bay 1,860 min est Running
Blast Blast Booth 1,860 min est Waiting
Coat Powder Coating — Batch Plant 1,860 min est Waiting
QA QA & Packing 1,860 min est Waiting
Pack QA & Packing 1,860 min est Waiting

Materials

$285 at cost
Item codeDescriptionRequiredIssuedIn stock
HDG-50-36-M 50 NB x 3.6mm HDG Pipe — Grade M 3 length 3 40
HW-BOLT-M12 Cup Head Bolt M12 x 40 — HDG 6 ea 6 67
FIT-GUD-16 Gudgeon Hinge 16mm — HDG 5 ea 5 105

Hours logged

15.2 hours
Ben Rowe 14 Aug 2026 Direct 7.6 h Approved
Ben Rowe 13 Aug 2026 Direct 7.6 h Approved

Details

Customer
Department of Justice — Corrections Victoria
Project
Ravenhall Correctional — Sallyport Gates
From quote
Q-2026-0485
Type
Gate
Quantity
4 ea
Work centre
Fabrication Bay 2
Assigned
Ben Rowe
Opened
11 Aug 2026
Due
7 Sep 2026
Colour
Ironstone®
Powder
Dulux · Satin
Drawing
DG-4602-G1

Move stage

Moving to Blast or Coating books this job into the coating queue with its m² and colour already on it.

Specification

4 x cantilever sallyport gates, 8.4m clear opening, palisade infill to match existing. Interlock ready.