← Barwon Prison — Perimeter Upgrade
Palisade pale rework — 240 off, coating fault rectification
High Blast
Sell value$11,049ex GST
Cost to make$7,880material, labour and coating
Gross profit$3,16928.7% margin
Hours22.0of 32 estimated
Operation card
5 of 8 complete Cut Bandsaw & Cutting 214 min 22 Jul, 9:00am
Josh Tran
Josh Tran
Bend Press & Folding 247 min 24 Jul, 12:00pm
Josh Tran
Josh Tran
Fabricate Fabrication Bay 1 287 min 26 Jul, 10:00am
Josh Tran
Josh Tran
Weld Welding Bay 227 min 28 Jul, 1:00pm
Josh Tran
Josh Tran
Blast Blast Booth 225 min 30 Jul, 11:00am
Josh Tran
Josh Tran
Coat Powder Coating — Batch Plant 240 min est Running
QA QA & Packing 240 min est Waiting
Pack QA & Packing 240 min est Waiting
Materials
$33,842 at cost| Item code | Description | Required | Issued | In stock |
|---|---|---|---|---|
| HDG-50-36-M | 50 NB x 3.6mm HDG Pipe — Grade M | 382 length | 382 | 40 |
| HW-BOLT-M12 | Cup Head Bolt M12 x 40 — HDG | 473 ea | 473 | 67 |
| FIT-GUD-16 | Gudgeon Hinge 16mm — HDG | 127 ea | 127 | 105 |
Hours logged
15.2 hours| Josh Tran | 14 Aug 2026 | Direct | 7.6 h | Approved |
| Josh Tran | 13 Aug 2026 | Direct | 7.6 h | Approved |
Details
- Customer
- Department of Justice — Corrections Victoria
- Project
- Barwon Prison — Perimeter Upgrade
- From quote
- Q-2026-0464
- Type
- Custom fence
- Quantity
- 240 ea
- Work centre
- Blast Booth
- Assigned
- Josh Tran
- Opened
- 19 Jul 2026
- Due
- 18 Aug 2026
- Colour
- Ironstone®
- Powder
- Dulux · Satin
- Drawing
- DG-4361-R1
Move stage
Moving to Blast or Coating books this job into the coating queue with its m² and colour already on it.
In the booth
| CD-2026-0925 Blast + powder coat | 1,632.0 m² | Blasting |
Specification
Palisade 2950 triple pointed on 63x63 rails, UC150x100 posts, anti-tamper shear nuts throughout. Detention grade.
Edit job
Log hours against this job