← Mildura Solar Farm — Substation Compound
Substation vehicle gate 5.4m — Mildura
Scheduled
Sell value$16,369ex GST
Cost to make$8,676material, labour and coating
Gross profit$7,69347.0% margin
Hours0.0of 48 estimated
Operation card
0 of 8 complete Cut Bandsaw & Cutting 360 min est Waiting
Bend Press & Folding 360 min est Waiting
Fabricate Fabrication Bay 1 360 min est Waiting
Weld Welding Bay 360 min est Waiting
Blast Blast Booth 360 min est Waiting
Coat Powder Coating — Batch Plant 360 min est Waiting
QA QA & Packing 360 min est Waiting
Pack QA & Packing 360 min est Waiting
Materials
$185 at cost| Item code | Description | Required | Issued | In stock |
|---|---|---|---|---|
| HDG-50-36-M | 50 NB x 3.6mm HDG Pipe — Grade M | 2 length | 0 | 40 |
| HW-BOLT-M12 | Cup Head Bolt M12 x 40 — HDG | 1 ea | 0 | 67 |
| FIT-GUD-16 | Gudgeon Hinge 16mm — HDG | 3 ea | 0 | 105 |
Hours logged
19.1 hours| Adem Yilmaz | 14 Aug 2026 | Direct | 9.7 h | Approved |
| Adem Yilmaz | 13 Aug 2026 | Direct | 9.4 h | Approved |
Details
- Customer
- McCorkell Constructions
- Project
- Mildura Solar Farm — Substation Compound
- From quote
- Q-2026-0548
- Type
- Gate
- Quantity
- 2 ea
- Work centre
- Fabrication Bay 2
- Assigned
- Adem Yilmaz
- Opened
- 2 Aug 2026
- Due
- 31 Aug 2026
- Colour
- Woodland Grey®
- Powder
- Dulux · Satin
- Drawing
- DG-4515-G1
Move stage
Moving to Blast or Coating books this job into the coating queue with its m² and colour already on it.
Specification
Palisade 2350 to the substation, chain mesh 2.4m to the array boundary. Remote site, freight consolidated.