← St Patrick's College — Performing Arts Centre
Blade panel 2400 x 1800 — St Patrick's PAC
Critical Despatched
Sell value$122,760ex GST
Cost to make$77,864material, labour and coating
Gross profit$44,89636.6% margin
Hours194.0of 186 estimated
Operation card
8 of 8 complete Cut Bandsaw & Cutting 1,473 min 22 Jun, 2:00pm
Tony Milenkovic
Tony Milenkovic
Bend Press & Folding 1,590 min 24 Jun, 1:00pm
Tony Milenkovic
Tony Milenkovic
Fabricate Fabrication Bay 1 1,400 min 26 Jun, 2:00pm
Tony Milenkovic
Tony Milenkovic
Weld Welding Bay 1,736 min 28 Jun, 9:00am
Tony Milenkovic
Tony Milenkovic
Blast Blast Booth 1,613 min 30 Jun, 3:00pm
Tony Milenkovic
Tony Milenkovic
Coat Powder Coating — Batch Plant 1,808 min 2 Jul, 11:00am
Tony Milenkovic
Tony Milenkovic
QA QA & Packing 1,503 min 4 Jul, 11:00am
Tony Milenkovic
Tony Milenkovic
Pack QA & Packing 1,612 min 6 Jul, 10:00am
Tony Milenkovic
Tony Milenkovic
Materials
$7,625 at cost| Item code | Description | Required | Issued | In stock |
|---|---|---|---|---|
| HDG-50-36-M | 50 NB x 3.6mm HDG Pipe — Grade M | 81 length | 81 | 40 |
| HW-BOLT-M12 | Cup Head Bolt M12 x 40 — HDG | 130 ea | 130 | 67 |
| FIT-GUD-16 | Gudgeon Hinge 16mm — HDG | 125 ea | 125 | 105 |
Details
- Customer
- St Patrick's College Ballarat
- Project
- St Patrick's College — Performing Arts Centre
- From quote
- Q-2026-0478
- Type
- Blade panel
- Quantity
- 62 ea
- Work centre
- Fabrication Bay 1
- Assigned
- Tony Milenkovic
- Opened
- 19 Jun 2026
- Due
- 4 Jul 2026
- Finished
- 3 Jul 2026
- Colour
- Monument®
- Powder
- Dulux · Satin
- Drawing
- DG-4198-B1
Move stage
Moving to Blast or Coating books this job into the coating queue with its m² and colour already on it.
Specification
Bespoke blade panels with blade fins welded to exposed post faces so the blade runs continuous and post gaps do not read. Plinth base detail. Architectural grad
Edit job
Log hours against this job