← Coating Runs
Anodic Natural
CR-2026-0291 · Automated line · Line oven · Matt ·
Interpon D2525 · Ricky Pereira
Complete
Loaded277 m² of 180 m² capacity
Dockets in this run2oven full
Trade value$14,821excludes our own jobs
Cure12 minat 200°C
What is in this run
277 m² across 2 dockets| Docket | Customer | Description | Treatment | m² | Status |
|---|---|---|---|---|---|
| CD-2026-0841 | Precision Metalworks Australia | Balustrade frames — Southbank tower L12-L18 | Blast + powder coat | 148.6 | Despatched |
| CD-2026-0855 | Alloy Architectural Metals | Architectural screen panels — Chadstone | Chromate + powder coat | 128.8 | Ready for despatch |
Waiting in Anodic Natural
Nothing waiting in this colour.
Run detail
- Date
- 12 Aug 2026
- Line
- Automated line
- Oven
- Line oven
- Colour
- Anodic Natural
- Powder
- Interpon D2525
- Gloss
- Matt
- Operator
- Ricky Pereira
- Capacity
- 180 m²
- Started
- 12 Aug, 7:30am
- Finished
- 12 Aug, 3:00pm