← Coating Runs
Monument®
CR-2026-0288 · Batch plant · Oven 1 · Satin ·
Dulux Duratec · Ricky Pereira
Complete
Loaded212 m² of 240 m² capacity
Dockets in this run128 m² still free
Trade value$8,921excludes our own jobs
Cure12 minat 200°C
What is in this run
212 m² across 1 dockets| Docket | Customer | Description | Treatment | m² | Status |
|---|---|---|---|---|---|
| CD-2026-0846 | Southern Steel Fabrication | Structural beams — warehouse portal frames | Blast + powder coat | 212.4 | Despatched |
Waiting in Monument®
| Docket | Customer | m² | Fits? |
|---|---|---|---|
| CD-2026-0897 Stair stringers and landings | Dandenong Engineering Works | 128.6 | Next run |
Run detail
- Date
- 11 Aug 2026
- Line
- Batch plant
- Oven
- Oven 1
- Colour
- Monument®
- Powder
- Dulux Duratec
- Gloss
- Satin
- Operator
- Ricky Pereira
- Capacity
- 240 m²
- Started
- 11 Aug, 7:30am
- Finished
- 11 Aug, 3:00pm