← Casey Hospital — Emergency Expansion
Casey Hospital — emergency expansion
Q-2026-0541 ·
Kane Constructions ·
Issued 2 Feb 2026 · Valid to 4 Mar 2026
Accepted
DOOGOOD AUSTRALIA
20 Green Street, Doveton VIC 3177
1300 123 342 · sales@doogoodaustralia.com.au
ABN 58 126 447 903
1300 123 342 · sales@doogoodaustralia.com.au
ABN 58 126 447 903
Quotation to
Kane Constructions
Fiona Ashworth
Richmond VIC
ABN 51 007 236 449
Richmond VIC
ABN 51 007 236 449
Project
Casey Hospital — Emergency Expansion
Healthcare
Plant compound screening in Corromesh, ambulance bay bollards, modular handrail to the ramp. Surfmist.
Plant compound screening in Corromesh, ambulance bay bollards, modular handrail to the ramp. Surfmist.
Steel Supply
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| CORRO-2400-PC | Corromesh Panel 2.4m — plant compound screening | 148 | panel | $468.00 | $69,264.00 |
| HR-MOD-1800 | Modular Handrail Section 1800mm — ramp | 96 | ea | $189.60 | $18,201.60 |
Manufacturing
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| — | Ambulance bay bollard 165 CHS — in-ground, impact rated | 32 | ea | $412.00 | $13,184.00 |
| — | Plant compound access gate 3.6m — Corromesh infill | 2 | ea | $7,800.00 | $15,600.00 |
Coating Services
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| — | Powder coat bollards, handrail and gates — Surfmist satin | 386 | m2 | $44.00 | $16,984.00 |
Notes
Prices are ex works Doveton unless stated. Products are manufactured to Australian Standards — AS/NZS 1163 and AS1074 for steel sections, AS/NZS 4534 for wire products, AS4506 for powder coating and AS1627.4 Class 2.5 for abrasive blasting. Powder coating carries a 15 year warranty on architectural finishes. Lead times confirmed on order.
| Subtotal (ex GST) | $133,233.60 |
| GST 10% | $13,323.36 |
| Total incl GST | $146,556.96 |
Lines
Cost $85,356 · GP $47,878 (35.9%)
| Division | Item | Description | Qty | Rate | Cost | Amount | |
|---|---|---|---|---|---|---|---|
| Steel Supply | CORRO-2400-PC | Corromesh Panel 2.4m — plant compound screening | 148 panel | $468.00 | $312.00 | $69,264.00 | |
| Steel Supply | HR-MOD-1800 | Modular Handrail Section 1800mm — ramp | 96 ea | $189.60 | $118.50 | $18,201.60 | |
| Manufacturing | — | Ambulance bay bollard 165 CHS — in-ground, impact rated | 32 ea | $412.00 | $254.00 | $13,184.00 | |
| Manufacturing | — | Plant compound access gate 3.6m — Corromesh infill | 2 ea | $7,800.00 | $4,820.00 | $15,600.00 | |
| Coating Services | — | Powder coat bollards, handrail and gates — Surfmist satin | 386 m2 | $44.00 | $26.00 | $16,984.00 |
Accept this quote?
It will allocate stock, raise the workshop jobs, book the coating and draft the deposit invoice — in one transaction.
Steel Supply — $87,466
Manufacturing — $28,784
Coating Services — $16,984
Deposit invoice $43,967 queued for MYOB
Casey Hospital — Emergency Expansion moves to Won
Add a line