← DCI MEL01 — Laverton North
DCI MEL01 Laverton North — perimeter and gate package
Q-2026-0408 ·
DCI Data Centers ·
Issued 8 Aug 2026 · Valid to 7 Sep 2026
Sent
What accepting this does
Read from the division on each lineSteel Supply
3 item codes allocated out of stock
$342,406
Manufacturing
2 jobs raised into the workshop
$55,000
Coating Services
622 m² booked into the coating queue
$27,368
Money
30% deposit invoice drafted and queued for MYOB
$140,175
Customer accept link — /q/dg2ex4 (open it in another tab; no email needed)
DOOGOOD AUSTRALIA
20 Green Street, Doveton VIC 3177
1300 123 342 · sales@doogoodaustralia.com.au
ABN 58 126 447 903
1300 123 342 · sales@doogoodaustralia.com.au
ABN 58 126 447 903
Quotation to
DCI Data Centers
Stuart Kenning
North Sydney NSW
ABN 78 634 117 205
North Sydney NSW
ABN 78 634 117 205
Project
DCI MEL01 — Laverton North
Data Centre
3.6m 358 mesh, 100NB posts at 3.0m centres, powder coated Basalt. Gate access to the loading dock.
3.6m 358 mesh, 100NB posts at 3.0m centres, powder coated Basalt. Gate access to the loading dock.
Steel Supply
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| 358-3600-PC | 358 Security Mesh Panel 3.6m — Powder Coated Basalt | 402 | panel | $640.00 | $257,280.00 |
| POST-100-42 | Fence Post 100NB x 4.2m — HDG | 418 | ea | $179.80 | $75,156.40 |
| HW-CLIP-358 | 358 Panel Clip Kit — anti-tamper | 402 | kit | $24.80 | $9,969.60 |
Manufacturing
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| — | Sliding gate 8.0m on tunnel posts — 358 infill | 2 | ea | $22,600.00 | $45,200.00 |
| — | Loading dock swing gate pair 4.8m | 1 | ea | $9,800.00 | $9,800.00 |
Coating Services
| Item | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| — | Powder coat posts and gate frames — Basalt satin | 622 | m2 | $44.00 | $27,368.00 |
Notes
Prices are ex works Doveton unless stated. Products are manufactured to Australian Standards — AS/NZS 1163 and AS1074 for steel sections, AS/NZS 4534 for wire products, AS4506 for powder coating and AS1627.4 Class 2.5 for abrasive blasting. Powder coating carries a 15 year warranty on architectural finishes. Lead times confirmed on order.
| Subtotal (ex GST) | $424,774.00 |
| GST 10% | $42,477.40 |
| Total incl GST | $467,251.40 |
Lines
Cost $291,380 · GP $133,394 (31.4%)
| Division | Item | Description | Qty | Rate | Cost | Amount | |
|---|---|---|---|---|---|---|---|
| Steel Supply | 358-3600-PC | 358 Security Mesh Panel 3.6m — Powder Coated Basalt | 402 panel | $640.00 | $470.00 | $257,280.00 | |
| Steel Supply | POST-100-42 | Fence Post 100NB x 4.2m — HDG | 418 ea | $179.80 | $112.40 | $75,156.40 | |
| Steel Supply | HW-CLIP-358 | 358 Panel Clip Kit — anti-tamper | 402 kit | $24.80 | $12.40 | $9,969.60 | |
| Manufacturing | — | Sliding gate 8.0m on tunnel posts — 358 infill | 2 ea | $22,600.00 | $14,100.00 | $45,200.00 | |
| Manufacturing | — | Loading dock swing gate pair 4.8m | 1 ea | $9,800.00 | $6,100.00 | $9,800.00 | |
| Coating Services | — | Powder coat posts and gate frames — Basalt satin | 622 m2 | $44.00 | $26.00 | $27,368.00 |
Accept this quote?
It will allocate stock, raise the workshop jobs, book the coating and draft the deposit invoice — in one transaction.
Steel Supply — $342,406
Manufacturing — $55,000
Coating Services — $27,368
Deposit invoice $140,175 queued for MYOB
DCI MEL01 — Laverton North moves to Won
Add a line