← Coating Intake
Ambulance bay bollard 165 CHS — Casey Hospital — internal, from J-2026-1377
In coating run
Surface area44.8 m²32 ea · 806 kg
TreatmentPowder coat onlyAS1627.4 Class 2.5 · AS4506-2005
Colour Surfmist® Dulux Duratec · Satin
Cost centre Job charged to J-2026-1377
DOOGOOD AUSTRALIA
Coating Services · Unit 5A, 28–30 Green Street, Doveton VIC 3177
1300 123 342 · ABN 58 126 447 903
1300 123 342 · ABN 58 126 447 903
Steel supplied by
Kane Constructions
Fiona Ashworth
ABN 51 007 236 449
ABN 51 007 236 449
Specification
Powder coat only
Dulux Duratec — Surfmist®, Satin
Blast to AS1627.4 Class 2.5 · Coat to AS4506-2005
Blast to AS1627.4 Class 2.5 · Coat to AS4506-2005
Received
| Description | Type | Pieces | Surface m² | Weight kg | Longest |
|---|---|---|---|---|---|
| Ambulance bay bollard 165 CHS — Casey Hospital — internal, from J-2026-1377 | Machinery | 32 | 44.8 | 806 | 6.0 m |
Progress through the plant
Booked in Done
Received Done
Blasting Done
Ready to coat Done
In coating run Now
Curing —
QA —
Ready for despatch —
Despatched —
Details
- Customer
- Kane Constructions
- Project
- PRJ-2026-006
- From job
- J-2026-1377
- Received
- 15 Aug 2026
- Promised
- 19 Aug 2026
- Treatment
- Powder coat only
- Colour
- Surfmist®
- Powder
- Dulux Duratec
- Gloss
- Satin
- Surface
- 44.8 m²
- Linear
- 108 m
- Weight
- 806 kg
- Longest piece
- 6.0 m
- Booked in by
- Luke Antoniou
Move status
Edit docket